Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
979
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0653 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,530 | $6,844 | Not Implemented |
OK0653 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $14,697 | $8,210 | Implemented |
OK0653 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,582 | $600 | Not Implemented |
OK0653 # 04 Y:2003 | 04 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,904 | $13,860 | Not Implemented |
OK0653 # 05 Y:2003 | 05 | 2003 | INSTALL SET-BACK TIMERS | $5,337 | $3,280 | Not Implemented |
OK0653 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $25,432 | $4,800 | Not Implemented |
OK0653 # 07 Y:2003 | 07 | 2003 | AUTOMATE FINISHING PROCESS | $36,680 | $73,250 | Not Implemented |
UD0649 # 01 Y:2002 | 01 | 2002 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $72,080 | $3,600 | Not Implemented |
UD0649 # 02 Y:2002 | 02 | 2002 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $16,650 | $15,000 | Not Implemented |
UD0649 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,835 | $3,500 | Not Implemented |
UD0649 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,660 | $6,691 | Implemented |
UD0649 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,306 | $6,000 | Implemented |
UD0649 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,082 | $1,008 | Not Implemented |
UD0649 # 07 Y:2002 | 07 | 2002 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,615 | $1,275 | Not Implemented |
UD0649 # 08 Y:2002 | 08 | 2002 | INSTALL OCCUPANCY SENSORS | $512 | $113 | Not Implemented |
UD0649 # 09 Y:2002 | 09 | 2002 | INSULATE BARE EQUIPMENT | $502 | $1,640 | Not Implemented |
UD0649 # 10 Y:2002 | 10 | 2002 | MINIMIZE WATER USAGE | $373 | $0 | Implemented |
UD0649 # 11 Y:2002 | 11 | 2002 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $92 | $0 | Implemented |
LM0029 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $592 | $735 | Implemented |
LM0029 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Implemented |
LM0029 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,118 | $500 | Implemented |
LM0029 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,628 | $700 | Implemented |
LM0029 # 05 Y:2002 | 05 | 2002 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $200,000 | $163,000 | Not Implemented |
LM0029 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $40,500 | $7,960 | Not Implemented |
LM0029 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $45,000 | $16,500 | Not Implemented |