IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0649 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,082 $1,008 Not Implemented
UD0649 # 07 Y:2002 07 2002 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,615 $1,275 Not Implemented
UD0649 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $512 $113 Not Implemented
UD0649 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $502 $1,640 Not Implemented
UD0649 # 10 Y:2002 10 2002 MINIMIZE WATER USAGE $373 $0 Implemented
UD0649 # 11 Y:2002 11 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $92 $0 Implemented
LM0029 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $592 $735 Implemented
LM0029 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LM0029 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,118 $500 Implemented
LM0029 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,628 $700 Implemented
LM0029 # 05 Y:2002 05 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $200,000 $163,000 Not Implemented
LM0029 # 06 Y:2002 06 2002 DEVELOP STANDARD OPERATING PROCEDURES $40,500 $7,960 Not Implemented
LM0029 # 07 Y:2002 07 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $45,000 $16,500 Not Implemented
LM0029 # 08 Y:2002 08 2002 MODIFY WORKLOAD $247,361 $15,000 Not Implemented
LM0029 # 09 Y:2002 09 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165,000 $350,000 Not Implemented
LM0029 # 10 Y:2002 10 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,500 $1,000 Implemented
LM0029 # 11 Y:2002 11 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,500 $1,000 Implemented
UD0640 # 01 Y:2002 01 2002 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $181,200 $252,000 Not Implemented
UD0640 # 02 Y:2002 02 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $57,385 $82,200 Implemented
UD0640 # 03 Y:2002 03 2002 ADJUST VENTS TO MINIMIZE ENERGY USE $37,432 $39,000 Not Implemented
UD0640 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,719 $11,324 Not Implemented
UD0640 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $2,305 $6,500 Not Implemented
UD0640 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,815 $7,700 Implemented
BD0203 # 01 Y:2002 01 2002 USE RADIANT HEATER FOR SPOT HEATING $5,734 $6,000 Implemented
BD0203 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,911 $1,300 Implemented