IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0204 # 12 Y:1999 12 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $6,410 $1,424 Not Implemented
HO0204 # 13 Y:1999 13 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,250 $120 Implemented
HO0204 # 14 Y:1999 14 1999 MINIMIZE WATER USAGE $1,129 $600 Not Implemented
UD0569 # 01 Y:1999 01 1999 RECYCLE WHITE WATER $90,440 $0 Not Implemented
UD0569 # 02 Y:1999 02 1999 INCREASE USE OF AUTOMATION $65,250 $0 Implemented
UD0569 # 03 Y:1999 03 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $8,400 $2,500 Not Implemented
UD0569 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,058 $12,380 Not Implemented
UD0569 # 05 Y:1999 05 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,848 $632 Implemented
SD0207 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,824 $4,285 Not Implemented
SD0207 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $14,302 $0 Not Implemented
SD0207 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,246 $1,800 Not Implemented
SD0207 # 04 Y:1998 04 1998 AIR CONDITION ONLY SPACE NECESSARY $2,456 $895 Not Implemented
SD0207 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $254 $0 Not Implemented
SD0207 # 06 Y:1998 06 1998 TREAT AND REUSE RINSE WATERS $2,126 $300 Not Implemented
SD0207 # 07 Y:1998 07 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $12,929 $8,000 Not Implemented
SD0207 # 08 Y:1998 08 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $1,164 $0 Not Implemented
AS0231 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,912 $23,975 Implemented
AS0231 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $377 Not Implemented
AS0231 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $819 $822 Not Implemented
AS0231 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $613 $1,425 Implemented
AS0231 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,835 $11,600 Not Implemented
AS0231 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,005 $240 Not Implemented
AS0231 # 07 Y:1998 07 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $616 $60 Implemented
AS0231 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $525 $60 Not Implemented
AS0231 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $12,854 $450 Implemented