Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
967
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1028 # 08 Y:2021 | 08 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $210 | $600 | Not Implemented |
UD1028 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $0 | Not Implemented |
UD1028 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,408 | $2,814 | Implemented |
UD1028 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,623 | $5,000 | Not Implemented |
UD1028 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,469 | $4,200 | Not Implemented |
UD1028 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $0 | Not Implemented |
UD1028 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $782 | $0 | Implemented |
UD1028 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,034 | $0 | Not Implemented |
LE0509 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,633 | $9,000 | Implemented |
LE0509 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,037 | $8,000 | Implemented |
LE0509 # 03 Y:2021 | 03 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,755 | $56,400 | Implemented |
LE0509 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,834 | $2,500 | Implemented |
LE0509 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,607 | $50 | Not Implemented |
LE0503 # 05 Y:2021 | 05 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $56,981 | $300,000 | Implemented |
LE0503 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,126 | $15,100 | Implemented |
LE0503 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,254 | $17,500 | Implemented |
LE0503 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,108 | $45,000 | Implemented |
LE0503 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,633 | $50,000 | Implemented |
WV0605 # 09 Y:2021 | 09 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,833 | $1,500 | Implemented |
WV0605 # 01 Y:2021 | 01 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $59,363 | $10,625 | Not Implemented |
WV0605 # 02 Y:2021 | 02 | 2021 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $37,902 | $115,920 | Not Implemented |
WV0605 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $29,737 | $10,000 | Not Implemented |
WV0605 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $20,502 | $2,155 | Not Implemented |
WV0605 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,719 | $125 | Implemented |
WV0605 # 06 Y:2021 | 06 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $14,806 | $683 | Implemented |