IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0464 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $387 $290 Implemented
IA0464 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $15 Implemented
IA0464 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,199 $45 Implemented
IA0464 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,295 $10,281 Implemented
IA0464 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,737 $33,313 Implemented
IA0464 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,378 $7,606 Implemented
UD0826 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,622 $2,500 Implemented
UD0826 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,036 $2,500 Implemented
UD0826 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $978 $60 Implemented
UD0826 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $35,000 Implemented
UD0826 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $788 $2,200 Implemented
UD0826 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $5,734 $1,600 Implemented
UM0376 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $582 $6,500 Implemented
UM0376 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $7,625 $250 Implemented
UM0376 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,943 $2,800 Implemented
UM0376 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $248 $10 Implemented
UM0376 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $2,850 $2,850 Implemented
UM0376 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,126 $2,000 Implemented
UM0376 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,793 $200 Implemented
UM0376 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,012 $6,547 Implemented
UM0376 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,381 $9,416 Implemented
UM0376 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $36,732 Implemented
UA3004 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $626 $225 Implemented
UA3004 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $1,000 Implemented
MA0663 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $600 Implemented