IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0697 # 02 Y:2004 02 2004 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,330 $0 Implemented
UD0697 # 04 Y:2004 04 2004 REDUCE FLUID FLOW RATES $2,950 $0 Implemented
UD0697 # 11 Y:2004 11 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $782 $0 Implemented
UD0697 # 12 Y:2004 12 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $244 $0 Implemented
UD0697 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $240 $91 Implemented
UD0694 # 02 Y:2004 02 2004 AIR CONDITION ONLY SPACE NECESSARY $295,125 $0 Implemented
UD0694 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,763 $51,348 Implemented
UD0694 # 06 Y:2004 06 2004 REDUCE VENTILATION AIR $18,999 $0 Implemented
UD0694 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,530 $5,780 Implemented
UD0694 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $1,427 $210 Implemented
UD0694 # 11 Y:2004 11 2004 USE RADIANT HEATER FOR SPOT HEATING $883 $1,962 Implemented
UD0694 # 13 Y:2004 13 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $790 $660 Implemented
UD0694 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $393 $13 Implemented
UD0694 # 15 Y:2004 15 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $288 $0 Implemented
MA0551 # 01 Y:2004 01 2004 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $36,008 $0 Implemented
MA0551 # 02 Y:2004 02 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $13,353 $27,860 Implemented
MA0551 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $7,302 $4,680 Implemented
MA0551 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,941 $138 Implemented
MA0551 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,601 $850 Implemented
MA0551 # 07 Y:2004 07 2004 PAY BILLS ON TIME TO AVOID LATE FEES $2,179 $0 Implemented
MA0551 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $958 $1,020 Implemented
MA0551 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $50 Implemented
AM0459 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,000 $400 Implemented
AM0459 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,020 $500 Implemented
AM0459 # 04 Y:2004 04 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,680 $320 Implemented