IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0061 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $129 $170 Implemented
SF0061 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,658 $2,208 Implemented
SF0061 # 09 Y:1995 09 1995 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $7,532 $1,288 Implemented
MA0339 # 01 Y:1995 01 1995 BURN A LESS EXPENSIVE GRADE OF FUEL $4,128 $1,860 Implemented
MA0339 # 02 Y:1995 02 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,027 $3,770 Implemented
MA0339 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $0 Implemented
AS0143 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,285 $17,600 Implemented
AS0143 # 02 Y:1995 02 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,244 $60,000 Implemented
AS0143 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,764 $5,461 Implemented
AS0143 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,544 $0 Implemented
AS0143 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,823 $500 Implemented
AS0143 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $349 $599 Implemented
AS0143 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $8,829 $10,900 Implemented
AS0143 # 09 Y:1995 09 1995 ADJUST BURNERS FOR EFFICIENT OPERATION $1,479 $2,000 Implemented
AS0143 # 10 Y:1995 10 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $115 Implemented
OR0228 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $196 $376 Implemented
OR0228 # 05 Y:1995 05 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $13,587 $54,901 Implemented
OR0229 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $2,000 Implemented
OR0229 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85 $269 Implemented
OR0229 # 05 Y:1995 05 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $42,278 $66,500 Implemented
SD0097 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $613 $300 Implemented
SD0097 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,480 $3,045 Implemented
SD0097 # 05 Y:1994 05 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,331 $2,205 Implemented
HO0091 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,017 $1,493 Implemented
HO0091 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $1,093 Implemented