Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0514 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,822 | $15,554 | Not Implemented |
SF0514 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,916 | $35,168 | Implemented |
SF0514 # 08 Y:2018 | 08 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,211 | $4,676 | Not Implemented |
SF0514 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,802 | $28,747 | Not Implemented |
SF0514 # 10 Y:2018 | 10 | 2018 | RECYCLE WHITE WATER | $65,046 | $196,690 | Not Implemented |
MI0325 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,225 | $14,854 | Not Implemented |
MI0325 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,604 | $1,660 | Implemented |
MI0325 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,332 | $4,841 | Not Implemented |
MI0325 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,058 | $9,700 | Not Implemented |
MI0325 # 05 Y:2017 | 05 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,801 | $160 | Implemented |
MI0325 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,645 | $2,520 | Implemented |
MI0325 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,220 | $1,600 | Implemented |
MI0325 # 08 Y:2017 | 08 | 2017 | USE OPTIMUM THICKNESS INSULATION | $1,467 | $388 | Implemented |
MI0325 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $979 | $3,042 | Implemented |
SF0511 # 01 Y:2017 | 01 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $2,043 | $0 | Implemented |
SF0511 # 02 Y:2017 | 02 | 2017 | REDUCE VENTILATION AIR | $1,680 | $0 | Implemented |
SF0511 # 03 Y:2017 | 03 | 2017 | COVER OPEN TANKS | $2,660 | $1,059 | Implemented |
SF0511 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $824 | $1,526 | Implemented |
SF0511 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $5,219 | Implemented |
CL1704 # 01 Y:2017 | 01 | 2017 | RECOVER AND REUSE COOLING WATER | $31,006 | $0 | Not Implemented |
CL1704 # 02 Y:2017 | 02 | 2017 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $11,470 | $15,000 | Implemented |
CL1704 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,811 | $21,000 | Implemented |
CL1704 # 04 Y:2017 | 04 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,656 | $3,050 | Not Implemented |
CL1704 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,502 | $900 | Not Implemented |
MZ0240 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,020 | $6,000 | Implemented |