IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,567

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0541 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,969 $252,894 Not Implemented
WV0541 # 02 Y:2017 02 2017 INSTALL SENSORS TO DETECT DEFECTS $60,138 $100,000 Not Implemented
WV0541 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $40,630 $534 Implemented
WV0541 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,042 $29,880 Not Implemented
WV0541 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $29,320 $72,000 Not Implemented
WV0541 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $13,353 $1,514 Implemented
WV0541 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $3,860 $2,024 Implemented
WV0541 # 08 Y:2017 08 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $1,206 $5,500 Not Implemented
WV0541 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $869 $1,671 Implemented
OK0960 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,672 $13,125 Implemented
OK0960 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $287 $847 Implemented
OK0960 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,955 $5,880 Not Implemented
OK0960 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $917 $600 Not Implemented
OK0960 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,164 $3,055 Not Implemented
OK0960 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $770 $150 Implemented
WV0534 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,092 $3,000 Not Implemented
WV0534 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,016 $0 Implemented
WV0534 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,083 $1,000 Implemented
WV0534 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,026 $4,100 Implemented
WV0534 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,565 $4,150 Not Implemented
WV0534 # 06 Y:2016 06 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,300 $2,900 Not Implemented
WV0534 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $1,196 $1,953 Implemented
WV0534 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $616 $315 Implemented
WV0534 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $474 $256 Implemented
WV0534 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $471 $1,125 Implemented