Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,648
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0594 # 06 Y:2025 | 06 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,643 | $16,923 | n/a |
LE0594 # 08 Y:2025 | 08 | 2025 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,529 | $74,000 | n/a |
LE0587 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $735 | $2,997 | n/a |
LE0587 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $667 | $2,000 | n/a |
LE0587 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,495 | $190,400 | n/a |
LE0587 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,080 | $15,000 | n/a |
LE0587 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,795 | $1,400 | n/a |
LE0587 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,438 | $0 | n/a |
LE0587 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,851 | $6,801 | n/a |
UU0263 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,090 | $5,000 | n/a |
UU0263 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,270 | $7,380 | n/a |
UU0263 # 12 Y:2025 | 12 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,910 | $158,576 | n/a |
UU0263 # 10 Y:2025 | 10 | 2025 | PAY UTILITY BILLS ON TIME | $1,860 | $1,500 | n/a |
UU0263 # 05 Y:2025 | 05 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,948 | $2,110 | n/a |
UU0263 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,105 | $5,100 | n/a |
UU0263 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $945 | $3,580 | n/a |
UU0263 # 03 Y:2025 | 03 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,365 | $1,730 | n/a |
UU0263 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,805 | $8,150 | n/a |
UU0263 # 01 Y:2025 | 01 | 2025 | INSTALL COMMON HEADER ON COMPRESSORS | $7,583 | $46,630 | n/a |
UU0263 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,940 | $9,000 | n/a |
UU0263 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,840 | $11,200 | n/a |
IC0317 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $397 | $597 | n/a |
IC0317 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $151 | $425 | n/a |
IC0317 # 08 Y:2025 | 08 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $15,053 | $20,087 | n/a |
IC0317 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $972 | $2,234 | n/a |