Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0557 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $470 | $1,340 | Implemented |
MA0557 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,428 | $3,450 | Implemented |
MA0544 # 01 Y:2003 | 01 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,663 | $2,000 | Implemented |
MA0544 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,425 | $2,000 | Not Implemented |
MA0544 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,646 | $6,156 | Implemented |
MA0544 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $1,236 | $600 | Not Implemented |
MA0544 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $543 | $20 | Implemented |
MA0459 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $55 | $248 | Implemented |
MA0459 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $266 | $1,250 | Not Implemented |
MA0459 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $557 | $1,275 | Not Implemented |
MA0459 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $789 | $150 | Implemented |
MA0459 # 02 Y:2000 | 02 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,064 | $150 | Implemented |
MA0459 # 01 Y:2000 | 01 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,945 | $7,695 | Not Implemented |
MA0448 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $837 | $1,976 | Not Implemented |
MA0448 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $316 | $1,425 | Implemented |
MA0448 # 06 Y:1999 | 06 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $558 | $0 | Implemented |
MA0448 # 08 Y:1999 | 08 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $186 | $880 | Not Implemented |
MA0448 # 04 Y:1999 | 04 | 1999 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $1,558 | $5,000 | Implemented |
MA0448 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,455 | $80 | Implemented |
MA0448 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,147 | $6,075 | Not Implemented |
MA0448 # 01 Y:1999 | 01 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $65,104 | $361,250 | Not Implemented |
MA0441 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $632 | $2,250 | Implemented |
MA0441 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,069 | $26,625 | Not Implemented |
MA0441 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,964 | $40,000 | Not Implemented |
MA0441 # 02 Y:1999 | 02 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $43,200 | $3,000 | Implemented |