IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0034 # 05 Y:2013 05 2013 ELIMINATE A BY-PRODUCT $954 $2,210 Not Implemented
WM0034 # 06 Y:2013 06 2013 IMPROVE SPACE COMFORT CONDITIONING $3,125 $550 Implemented
CO0675 # 01 Y:2013 01 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $30,250 $172,320 Not Implemented
CO0675 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,730 $18,100 Not Implemented
CO0675 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $810 $1,280 Not Implemented
CO0675 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $270 $290 Implemented
IP0017 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $0 Not Implemented
IP0017 # 02 Y:2013 02 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,701 $0 Implemented
IP0017 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $805 $0 Implemented
IP0017 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,167 $1,400 Implemented
IP0017 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,754 $409 Implemented
IP0017 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $600 $159 Implemented
IP0017 # 07 Y:2013 07 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,599 $15,000 Not Implemented
IP0017 # 08 Y:2013 08 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,689 $3,600 Not Implemented
IP0017 # 09 Y:2013 09 2013 COVER OPEN TANKS $373 $503 Implemented
IP0017 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $9,348 Implemented
UM0428 # 01 Y:2013 01 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $74,405 $210,000 Not Implemented
UM0428 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,500 Implemented
UM0428 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $990 $100 Implemented
UM0428 # 04 Y:2013 04 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $636 $1,200 Implemented
UM0428 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,177 $9,000 Implemented
UM0428 # 06 Y:2013 06 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,332 $500 Not Implemented
SF0436 # 01 Y:2013 01 2013 COVER OPEN TANKS $6,314 $150 Not Implemented
SF0436 # 02 Y:2013 02 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $438 $0 Implemented
SF0436 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $2,488 $3,272 Not Implemented