Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0148 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $1,124 | $913 | Implemented |
IC0148 # 07 Y:2008 | 07 | 2008 | BURN WASTE OIL FOR HEAT | $4,155 | $0 | Implemented |
IC0148 # 08 Y:2008 | 08 | 2008 | TREAT AND REUSE RINSE WATERS | $21,012 | $27,696 | Not Implemented |
SF0359 # 01 Y:2008 | 01 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,430 | $0 | Implemented |
SF0359 # 02 Y:2008 | 02 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $870 | $904 | Implemented |
SF0359 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,576 | $523 | Implemented |
SF0359 # 04 Y:2008 | 04 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,314 | $1,577 | Implemented |
SF0359 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,881 | $6,200 | Not Implemented |
SF0359 # 06 Y:2008 | 06 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $453 | Implemented |
SF0359 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $929 | $4,808 | Implemented |
SF0359 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $955 | $6,455 | Not Implemented |
SF0359 # 09 Y:2008 | 09 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,974 | $1,575,000 | Not Implemented |
MI0164 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $114,642 | $3,960 | Implemented |
MI0164 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $80,047 | $6,886 | Implemented |
MI0164 # 03 Y:2008 | 03 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,553 | $22,366 | Not Implemented |
MI0164 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,799 | $40 | Implemented |
MI0164 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,597 | $4,400 | Implemented |
MI0164 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,466 | $1,032 | Implemented |
MI0164 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,297 | $40 | Implemented |
MI0164 # 08 Y:2008 | 08 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,657 | $4,400 | Not Implemented |
MI0164 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,992 | $1,032 | Implemented |
MI0164 # 10 Y:2008 | 10 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,174 | $260 | Not Implemented |
MI0164 # 11 Y:2008 | 11 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $842 | $0 | Not Implemented |
WV0371 # 01 Y:2008 | 01 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $284,875 | $10,157 | Implemented |
WV0371 # 02 Y:2008 | 02 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $249,839 | $8,000 | Not Implemented |