Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
265
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0005 # 09 Y:2022 | 09 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $563 | $500 | Implemented |
CI0005 # 10 Y:2022 | 10 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $323 | $0 | Not Implemented |
SF0593 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,621 | $0 | Implemented |
SF0593 # 02 Y:2023 | 02 | 2023 | COVER OPEN TANKS | $5,939 | $1,586 | Not Implemented |
SF0593 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $303 | $85 | Implemented |
SF0593 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,351 | $1,069 | Implemented |
SF0593 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $822 | $334 | Implemented |
SF0593 # 06 Y:2023 | 06 | 2023 | USE OPTIMUM THICKNESS INSULATION | $863 | $905 | Implemented |
SF0593 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,539 | $5,175 | Not Implemented |
SF0593 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,486 | $9,050 | Implemented |
SF0593 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,111 | $42,120 | Not Implemented |
SF0561 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $3,116 | $1,412 | Implemented |
SF0561 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,397 | $525 | Not Implemented |
SF0561 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,203 | $110 | Not Implemented |
SF0561 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,435 | $3,959 | Not Implemented |
SF0561 # 06 Y:2020 | 06 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,263 | $18,437 | Not Implemented |
SF0561 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,550 | $236,909 | Implemented |
SF0561 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,548 | $4,226 | Implemented |
SD0573 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,784 | $5,838 | Implemented |
SD0573 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $14,519 | $67,626 | Implemented |
SD0573 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,330 | $10,000 | Implemented |
SD0573 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,699 | $900 | Implemented |
SD0573 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $64 | $63 | Implemented |
SD0573 # 05 Y:2018 | 05 | 2018 | USE PHOTOCELL CONTROLS | $1,115 | $2,775 | Implemented |
SD0561 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $615 | $1,015 | Implemented |