IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

265

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0005 # 09 Y:2022 09 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $563 $500 Implemented
CI0005 # 10 Y:2022 10 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $323 $0 Not Implemented
SF0593 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,621 $0 Implemented
SF0593 # 02 Y:2023 02 2023 COVER OPEN TANKS $5,939 $1,586 Not Implemented
SF0593 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $85 Implemented
SF0593 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,351 $1,069 Implemented
SF0593 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $822 $334 Implemented
SF0593 # 06 Y:2023 06 2023 USE OPTIMUM THICKNESS INSULATION $863 $905 Implemented
SF0593 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,539 $5,175 Not Implemented
SF0593 # 08 Y:2023 08 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,486 $9,050 Implemented
SF0593 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $6,111 $42,120 Not Implemented
SF0561 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $3,116 $1,412 Implemented
SF0561 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,397 $525 Not Implemented
SF0561 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,203 $110 Not Implemented
SF0561 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,435 $3,959 Not Implemented
SF0561 # 06 Y:2020 06 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,263 $18,437 Not Implemented
SF0561 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $35,550 $236,909 Implemented
SF0561 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,548 $4,226 Implemented
SD0573 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,784 $5,838 Implemented
SD0573 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $14,519 $67,626 Implemented
SD0573 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,330 $10,000 Implemented
SD0573 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,699 $900 Implemented
SD0573 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $64 $63 Implemented
SD0573 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $1,115 $2,775 Implemented
SD0561 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $615 $1,015 Implemented