IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0562 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $361 $512 Implemented
BD0266 # 01 Y:2004 01 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $260 $11,000 Implemented
BD0266 # 02 Y:2004 02 2004 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $6,225 $4,930 Implemented
BD0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $600 Implemented
BD0266 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,081 $2,765 Implemented
BD0266 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $703 $1,425 Implemented
BD0266 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $220 Implemented
BD0266 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $323 Implemented
BD0266 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $510 Implemented
BD0266 # 09 Y:2004 09 2004 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $2,462 $1,575 Not Implemented
BD0266 # 10 Y:2004 10 2004 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,020 $96 Implemented
BD0266 # 11 Y:2004 11 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,200 $96 Implemented
BD0266 # 12 Y:2004 12 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,404 $2,500 Implemented
LM0081 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,802 $0 Not Implemented
LM0081 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,857 $300 Implemented
LM0081 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $85 $0 Not Implemented
LM0081 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $160 $80 Not Implemented
LM0081 # 05 Y:2004 05 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $233,065 $1,000 Not Implemented
LM0081 # 06 Y:2004 06 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $292,248 $4,925 Not Implemented
LM0081 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,611 $1,814 Not Implemented
MA0558 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,200 $4,500 Implemented
MA0558 # 02 Y:2004 02 2004 USE MINIMUM STEAM OPERATING PRESSURE $19,575 $1,000 Not Implemented
MA0558 # 03 Y:2004 03 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,830 $5,000 Implemented
MA0558 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,494 $4,680 Implemented
MA0558 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,990 $0 Not Implemented