Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0558 # 06 Y:2004 | 06 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,912 | $0 | Implemented |
MA0558 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,965 | $2,690 | Implemented |
MA0558 # 08 Y:2004 | 08 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $979 | $240 | Not Implemented |
MA0557 # 01 Y:2004 | 01 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,922 | $25,100 | Not Implemented |
MA0557 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $5,528 | $3,118 | Implemented |
MA0557 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,428 | $3,450 | Implemented |
MA0557 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $1,706 | $708 | Implemented |
MA0557 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $470 | $1,340 | Implemented |
WI0474 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $213,585 | $150 | Implemented |
WI0474 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,878 | $44 | Implemented |
WI0474 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $22,030 | $17,000 | Not Implemented |
WI0474 # 04 Y:2004 | 04 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $21,301 | $39 | Implemented |
WI0474 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,940 | $790 | Not Implemented |
WI0474 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,067 | $785 | Not Implemented |
IC0083 # 01 Y:2004 | 01 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $31,787 | $32,056 | Not Implemented |
IC0083 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,453 | $2,048 | Implemented |
IC0083 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $239 | $508 | Not Implemented |
IC0083 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,166 | $18,190 | Not Implemented |
LE0186 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM THICKNESS INSULATION | $12,188 | $16,273 | Not Implemented |
LE0186 # 02 Y:2004 | 02 | 2004 | USE OPTIMUM THICKNESS INSULATION | $8,974 | $7,000 | Not Implemented |
LE0186 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,293 | $3,800 | Not Implemented |
LE0186 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM THICKNESS INSULATION | $2,885 | $641 | Not Implemented |
LE0186 # 05 Y:2004 | 05 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $1,428 | $600 | Implemented |
LE0186 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $773 | $200 | Implemented |
LE0186 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $405 | $0 | Implemented |