IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0558 # 06 Y:2004 06 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,912 $0 Implemented
MA0558 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,965 $2,690 Implemented
MA0558 # 08 Y:2004 08 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $979 $240 Not Implemented
MA0557 # 01 Y:2004 01 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,922 $25,100 Not Implemented
MA0557 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $5,528 $3,118 Implemented
MA0557 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,428 $3,450 Implemented
MA0557 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $1,706 $708 Implemented
MA0557 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $1,340 Implemented
WI0474 # 01 Y:2004 01 2004 ADOPT IN-HOUSE MATERIAL GENERATION $213,585 $150 Implemented
WI0474 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,878 $44 Implemented
WI0474 # 03 Y:2004 03 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,030 $17,000 Not Implemented
WI0474 # 04 Y:2004 04 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $21,301 $39 Implemented
WI0474 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,940 $790 Not Implemented
WI0474 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,067 $785 Not Implemented
IC0083 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $31,787 $32,056 Not Implemented
IC0083 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,453 $2,048 Implemented
IC0083 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $508 Not Implemented
IC0083 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,166 $18,190 Not Implemented
LE0186 # 01 Y:2004 01 2004 USE OPTIMUM THICKNESS INSULATION $12,188 $16,273 Not Implemented
LE0186 # 02 Y:2004 02 2004 USE OPTIMUM THICKNESS INSULATION $8,974 $7,000 Not Implemented
LE0186 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $3,293 $3,800 Not Implemented
LE0186 # 04 Y:2004 04 2004 USE OPTIMUM THICKNESS INSULATION $2,885 $641 Not Implemented
LE0186 # 05 Y:2004 05 2004 REPAIR OR REPLACE STEAM TRAPS $1,428 $600 Implemented
LE0186 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $773 $200 Implemented
LE0186 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $405 $0 Implemented