IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0098 # 05 Y:1987 05 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,880 $3,100 Not Implemented
MA0098 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $4,113 $2,238 Implemented
MA0098 # 07 Y:1987 07 1987 COVER OPEN TANKS $3,570 $1,122 Implemented
MA0098 # 08 Y:1987 08 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,884 $1,333 Implemented
MA0077 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $659 $212 Not Implemented
MA0077 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $370 $753 Not Implemented
MA0077 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,888 $4,650 Not Implemented
MA0077 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,705 $7,200 Not Implemented
MA0077 # 05 Y:1986 05 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $17,850 $22,500 Not Implemented
MA0077 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $40 Not Implemented
MA0077 # 07 Y:1986 07 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,650 $907 Not Implemented
MA0077 # 08 Y:1986 08 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,082 $0 Not Implemented
MA0060 # 01 Y:1986 01 1986 COVER OPEN TANKS $1,979 $207 Not Implemented
MA0060 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,411 $600 Not Implemented
MA0060 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $64 Not Implemented
MA0060 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $131 $100 Not Implemented
MA0060 # 05 Y:1986 05 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,064 $440 Not Implemented
MA0060 # 06 Y:1986 06 1986 REPAIR OR REPLACE STEAM TRAPS $8,227 $195 Not Implemented
MA0060 # 07 Y:1986 07 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $748 $1,107 Not Implemented
MA0060 # 08 Y:1986 08 1986 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $510 $340 Not Implemented
MA0060 # 09 Y:1986 09 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $808 $2,200 Not Implemented
MA0045 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $450 Implemented
MA0045 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $756 $750 Implemented
MA0045 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,100 $5,110 Not Implemented
MA0045 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,515 $2,816 Not Implemented