Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0239 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $28,000 | $12,000 | Not Implemented |
UD0646 # 01 Y:2002 | 01 | 2002 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $33,646 | $32,000 | Implemented |
UD0646 # 02 Y:2002 | 02 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,468 | $12,700 | Implemented |
UD0646 # 03 Y:2002 | 03 | 2002 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $9,581 | $675 | Not Implemented |
UD0646 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,685 | $2,000 | Implemented |
UD0646 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $2,204 | $3,320 | Not Implemented |
UD0646 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,390 | $5,088 | Not Implemented |
UD0646 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,342 | $61 | Not Implemented |
UD0646 # 08 Y:2002 | 08 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,092 | $0 | Not Implemented |
UD0646 # 09 Y:2002 | 09 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $613 | $1,431 | Not Implemented |
UD0646 # 10 Y:2002 | 10 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $379 | $499 | Implemented |
UD0646 # 11 Y:2002 | 11 | 2002 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $311 | $640 | Not Implemented |
IC0037 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $873 | $3,949 | Not Implemented |
IC0037 # 02 Y:2002 | 02 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $472 | $440 | Implemented |
WI0418 # 01 Y:2002 | 01 | 2002 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $151,650 | $60,000 | Not Implemented |
WI0418 # 02 Y:2002 | 02 | 2002 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $104,205 | $715,000 | n/a |
WI0418 # 03 Y:2002 | 03 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $65,100 | $150,000 | n/a |
WI0418 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,681 | $8,775 | Not Implemented |
WI0418 # 05 Y:2002 | 05 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,487 | $15,000 | n/a |
WI0418 # 06 Y:2002 | 06 | 2002 | INSTALL OCCUPANCY SENSORS | $870 | $150 | Implemented |
WI0418 # 07 Y:2002 | 07 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $850 | $0 | Not Implemented |
WI0418 # 08 Y:2002 | 08 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,492 | $630 | Not Implemented |
CO0500 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,000 | $7,000 | Implemented |
CO0500 # 02 Y:2002 | 02 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,990 | $300 | Implemented |
CO0500 # 03 Y:2002 | 03 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $2,640 | $5,750 | Not Implemented |