IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0239 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $28,000 $12,000 Not Implemented
UD0646 # 01 Y:2002 01 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $33,646 $32,000 Implemented
UD0646 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $25,468 $12,700 Implemented
UD0646 # 03 Y:2002 03 2002 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $9,581 $675 Not Implemented
UD0646 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,685 $2,000 Implemented
UD0646 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,204 $3,320 Not Implemented
UD0646 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $5,088 Not Implemented
UD0646 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $61 Not Implemented
UD0646 # 08 Y:2002 08 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,092 $0 Not Implemented
UD0646 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $613 $1,431 Not Implemented
UD0646 # 10 Y:2002 10 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $379 $499 Implemented
UD0646 # 11 Y:2002 11 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $311 $640 Not Implemented
IC0037 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $873 $3,949 Not Implemented
IC0037 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $472 $440 Implemented
WI0418 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $151,650 $60,000 Not Implemented
WI0418 # 02 Y:2002 02 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $104,205 $715,000 n/a
WI0418 # 03 Y:2002 03 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $65,100 $150,000 n/a
WI0418 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,681 $8,775 Not Implemented
WI0418 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,487 $15,000 n/a
WI0418 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $870 $150 Implemented
WI0418 # 07 Y:2002 07 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $850 $0 Not Implemented
WI0418 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,492 $630 Not Implemented
CO0500 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,000 $7,000 Implemented
CO0500 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,990 $300 Implemented
CO0500 # 03 Y:2002 03 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,640 $5,750 Not Implemented