IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0500 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,110 $4,890 Not Implemented
CO0500 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $730 $300 Implemented
CO0500 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $50 Implemented
CO0500 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $0 Not Implemented
IC0026 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $8,326 Implemented
IC0026 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,379 $25,075 Not Implemented
IC0026 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $102 $150 Implemented
IC0026 # 04 Y:2002 04 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $205,600 $100,000 Not Implemented
IC0026 # 05 Y:2002 05 2002 MODIFY WORKLOAD $77,900 $23,900 Implemented
SU0126 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $195,247 $2,000,000 Not Implemented
SU0126 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $18,512 $3,152 Implemented
SU0126 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,917 $307 Implemented
SU0126 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,232 $1,710 Not Implemented
SU0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $777 $0 Not Implemented
AS0312 # 01 Y:2001 01 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $95 $20 Implemented
AS0312 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16 $22 Implemented
AS0312 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $110 $265 Implemented
AS0312 # 04 Y:2001 04 2001 INSTALL SKYLIGHTS $458 $747 Not Implemented
AS0312 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $666 $60 Not Implemented
AS0312 # 06 Y:2001 06 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $779 $60 Implemented
AS0312 # 07 Y:2001 07 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $576 $60 Implemented
AS0312 # 08 Y:2001 08 2001 MODIFY WORKLOAD $2,000 $2,640 Implemented
AS0312 # 09 Y:2001 09 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $16,147 $1,786 Implemented
LE0110 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,815 $300 Implemented
LE0110 # 02 Y:2001 02 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,255 $850 Not Implemented