IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,567

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0156 # 06 Y:2000 06 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $50,436 $132,877 Not Implemented
DS0157 # 01 Y:2000 01 2000 USE OPTIMUM THICKNESS INSULATION $2,370 $688 Not Implemented
DS0157 # 02 Y:2000 02 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,432 $800 Not Implemented
DS0157 # 03 Y:2000 03 2000 $1,297 $0 Not Implemented
WI0364 # 01 Y:2000 01 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $20,162 $0 Implemented
WI0364 # 02 Y:2000 02 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,614 $15,000 Not Implemented
WI0364 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,918 $20,750 Not Implemented
WI0364 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,730 $740 Not Implemented
WI0364 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $90 Not Implemented
WI0364 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $1,567 $3,871 Not Implemented
WI0364 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $594 $438 Not Implemented
DS0154 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $1,239 $864 Implemented
DS0154 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,609 $10,510 Not Implemented
DS0154 # 03 Y:2000 03 2000 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,737 $8,160 Not Implemented
DS0154 # 04 Y:2000 04 2000 RECYCLE CLEANING SOLVENT AND REUSE $18,740 $17,676 Implemented
DS0154 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,521 $1,336 Implemented
DS0154 # 06 Y:2000 06 2000 $4,884 $0 Implemented
BD0148 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $10,397 $3,000 n/a
BD0148 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $9,788 $1,000 n/a
BD0148 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,112 $0 n/a
BD0148 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,057 $800 n/a
BD0148 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $945 $1,350 n/a
BD0148 # 06 Y:1999 06 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $653 $644 n/a
BD0148 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $1,350 n/a
BD0148 # 08 Y:1999 08 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $22,175 $25,000 n/a