IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,567

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0498 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $700 Not Implemented
UD0498 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,731 $6,298 Not Implemented
OK0500 # 01 Y:1996 01 1996 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $6,013 $0 Implemented
OK0500 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,222 $11,250 Not Implemented
OK0500 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,125 $620 Implemented
OK0500 # 04 Y:1996 04 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $420 $1,300 Implemented
OK0500 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $396 $35 Not Implemented
OK0500 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20 $30 Implemented
SD0150 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,102 $21,570 Implemented
SD0150 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,242 $3,920 Implemented
SD0150 # 03 Y:1996 03 1996 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $10,042 $4,160 Implemented
SD0150 # 04 Y:1996 04 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $2,408 $3,077 Implemented
SD0150 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $7,368 $5,825 Not Implemented
SD0150 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $7,565 $3,410 Implemented
SD0150 # 07 Y:1996 07 1996 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $34,791 $5,000 Implemented
DS0051 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $1,434 $1,257 Implemented
DS0051 # 04 Y:1996 04 1996 TREAT AND REUSE RINSE WATERS $8,506 $17,190 Implemented
DS0051 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $1,149 Not Implemented
DS0051 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,084 $3,765 Not Implemented
SD0146 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $857 $150 Implemented
SD0146 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $530 $659 Implemented
SD0146 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $564 Implemented
SD0146 # 04 Y:1996 04 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $373 $710 Implemented
SD0146 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $595 $394 Implemented
SD0146 # 06 Y:1996 06 1996 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $26,498 $0 Implemented