IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0526 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,823 $447 Not Implemented
SU0526 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $284 Not Implemented
SU0526 # 07 Y:2022 07 2022 INSTALL SET-BACK TIMERS $423 $627 Not Implemented
SU0526 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $158,273 $259,521 Not Implemented
SU0526 # 09 Y:2022 09 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,454 $16,991 Not Implemented
SU0526 # 10 Y:2022 10 2022 RECOVER WASTE HEAT FROM EQUIPMENT $98 $369 Not Implemented
SF0593 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,621 $0 Implemented
SF0593 # 02 Y:2023 02 2023 COVER OPEN TANKS $5,939 $1,586 Not Implemented
SF0593 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $85 Implemented
SF0593 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,351 $1,069 Implemented
SF0593 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $822 $334 Implemented
SF0593 # 06 Y:2023 06 2023 USE OPTIMUM THICKNESS INSULATION $863 $905 Implemented
SF0593 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,539 $5,175 Not Implemented
SF0593 # 08 Y:2023 08 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,486 $9,050 Implemented
SF0593 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $6,111 $42,120 Not Implemented
TR0028 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,361 $5,404 Not Implemented
TR0028 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $3,155 Implemented
TR0028 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,119 $11,200 Not Implemented
TR0028 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,584 $602 Implemented
TR0028 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $787 $1,511 Implemented
UW2208 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $643 $0 Implemented
UW2208 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
UW2208 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,686 $122 Implemented
UW2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $2,080 Implemented
UW2206 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,718 $0 Implemented