Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0693 # 08 Y:2004 | 08 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,575 | $0 | Not Implemented |
UD0693 # 09 Y:2004 | 09 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,466 | $0 | Implemented |
UD0693 # 10 Y:2004 | 10 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $1,299 | $296 | Implemented |
UD0693 # 11 Y:2004 | 11 | 2004 | INSTALL OCCUPANCY SENSORS | $1,013 | $420 | Not Implemented |
UD0693 # 12 Y:2004 | 12 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $899 | $0 | Not Implemented |
UD0693 # 13 Y:2004 | 13 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $506 | $0 | Implemented |
UD0693 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $444 | $13 | Not Implemented |
UD0693 # 15 Y:2004 | 15 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $210 | $0 | Not Implemented |
WV0239 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,858 | $13,440 | Implemented |
WV0239 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,082 | $500 | Implemented |
WV0239 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,589 | $4,390 | Not Implemented |
WV0239 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $10,526 | $1,582 | Not Implemented |
WV0239 # 05 Y:2002 | 05 | 2002 | USE OPTIMUM THICKNESS INSULATION | $3,072 | $1,080 | Implemented |
WV0239 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,529 | $0 | Implemented |
WV0239 # 07 Y:2002 | 07 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,408 | $1,044 | Implemented |
WV0239 # 08 Y:2002 | 08 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,932 | $5,580 | Not Implemented |
WV0239 # 09 Y:2002 | 09 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,443 | $140 | Implemented |
WV0239 # 10 Y:2002 | 10 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,680 | $300 | Implemented |
WV0239 # 11 Y:2002 | 11 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $174,164 | $15,000 | Not Implemented |
WV0239 # 12 Y:2002 | 12 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $7,200 | $100 | Implemented |
WV0239 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $28,000 | $12,000 | Not Implemented |
UD0613 # 01 Y:2001 | 01 | 2001 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,501 | $15,000 | Not Implemented |
UD0613 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,606 | $14,000 | Implemented |
UD0613 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,566 | $0 | Implemented |
UD0613 # 04 Y:2001 | 04 | 2001 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $5,513 | $5,000 | Implemented |