Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0340 # 10 Y:1995 | 10 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $356 | $570 | Implemented |
SF0061 # 01 Y:1995 | 01 | 1995 | INSTALL OCCUPANCY SENSORS | $1,935 | $360 | Not Implemented |
SF0061 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $129 | $170 | Implemented |
SF0061 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $347 | $1,570 | Not Implemented |
SF0061 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,658 | $2,208 | Implemented |
SF0061 # 05 Y:1995 | 05 | 1995 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $733 | $1,300 | Not Implemented |
SF0061 # 06 Y:1995 | 06 | 1995 | COVER OPEN TANKS | $3,373 | $1,560 | Not Implemented |
SF0061 # 07 Y:1995 | 07 | 1995 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $6,048 | $2,955 | Not Implemented |
SF0061 # 08 Y:1995 | 08 | 1995 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $2,880 | $25,300 | Not Implemented |
SF0061 # 09 Y:1995 | 09 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $7,532 | $1,288 | Implemented |
SF0061 # 10 Y:1995 | 10 | 1995 | TREAT AND REUSE RINSE WATERS | $10,340 | $6,344 | Not Implemented |
MA0339 # 01 Y:1995 | 01 | 1995 | BURN A LESS EXPENSIVE GRADE OF FUEL | $4,128 | $1,860 | Implemented |
MA0339 # 02 Y:1995 | 02 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,027 | $3,770 | Implemented |
MA0339 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $0 | Implemented |
MA0339 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $504 | $1,010 | Not Implemented |
MA0339 # 05 Y:1995 | 05 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $57,939 | $118,450 | Not Implemented |
MA0339 # 06 Y:1995 | 06 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $23,990 | $500 | Not Implemented |
MA0339 # 07 Y:1995 | 07 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $824 | $3,000 | Not Implemented |
AS0143 # 01 Y:1995 | 01 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,285 | $17,600 | Implemented |
AS0143 # 02 Y:1995 | 02 | 1995 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,244 | $60,000 | Implemented |
AS0143 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,764 | $5,461 | Implemented |
AS0143 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,544 | $0 | Implemented |
AS0143 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,823 | $500 | Implemented |
AS0143 # 06 Y:1995 | 06 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $349 | $599 | Implemented |
AS0143 # 07 Y:1995 | 07 | 1995 | INSULATE BARE EQUIPMENT | $8,829 | $10,900 | Implemented |