IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,567

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0500 # 01 Y:1993 01 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $4,608 $5,042 Implemented
TN0500 # 02 Y:1993 02 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,890 $1,460 Implemented
TN0500 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $645 $0 Not Implemented
TN0500 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $513 $0 Implemented
TN0500 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $242 Implemented
TN0500 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $249 $440 Not Implemented
TN0500 # 07 Y:1993 07 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $59 $560 Implemented
UD0400 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,689 $29,000 Implemented
UD0400 # 02 Y:1993 02 1993 UPGRADE CONTROLS ON COMPRESSORS $7,173 $0 Implemented
UD0400 # 03 Y:1993 03 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,233 $12,000 Implemented
UD0400 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $1,233 $1,000 Implemented
UD0400 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $4,282 Implemented
UD0400 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,699 $250 Implemented
MA0270 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $3,971 $4,811 Implemented
MA0270 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,894 $0 Implemented
MA0270 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,507 $390 Implemented
MA0270 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,159 $400 Implemented
MA0270 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $972 $0 Not Implemented
MA0270 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $899 $372 Not Implemented
MA0270 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $496 $1,227 Not Implemented
MA0270 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $176 Not Implemented
AS0078 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $167,933 $370,044 Not Implemented
AS0078 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $54,544 $70,044 Implemented
AS0078 # 03 Y:1993 03 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $403 $1,200 Implemented
AS0078 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,061 $10,100 Not Implemented