Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
191
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0227 # 01 Y:2019 | 01 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,221 | $800 | Not Implemented |
IC0227 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $1,500 | Not Implemented |
IC0227 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,117 | $7,146 | Not Implemented |
IC0227 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,978 | $9,600 | Not Implemented |
IC0227 # 05 Y:2019 | 05 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,871 | $28,000 | Not Implemented |
UM0473 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $2,449 | $630 | n/a |
UM0473 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,291 | $23,462 | n/a |
UM0473 # 04 Y:2016 | 04 | 2016 | COVER OPEN TANKS | $52,272 | $2,335 | n/a |
UM0473 # 08 Y:2016 | 08 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,901 | $10,265 | n/a |
UM0473 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,050 | $1,000 | n/a |
UM0473 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,566 | $1,000 | n/a |
UM0473 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $6,129 | $15,000 | n/a |
UM0473 # 05 Y:2016 | 05 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,899 | $2,835 | n/a |
UM0468 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,125 | $43,167 | Implemented |
UM0468 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $3,084 | $2,000 | Implemented |
UM0468 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,680 | $2,150 | Not Implemented |
UM0468 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $1,588 | $1,500 | Implemented |
UM0468 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $695 | $1,500 | Not Implemented |
UM0468 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,119 | $10,000 | Not Implemented |
UM0444 # 01 Y:2014 | 01 | 2014 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $216,000 | $500,000 | Not Implemented |
UM0444 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $71,820 | $133,000 | Not Implemented |
UM0444 # 05 Y:2014 | 05 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $104,300 | $208,000 | Not Implemented |
UM0444 # 03 Y:2014 | 03 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,306 | $80,000 | Not Implemented |
UM0444 # 04 Y:2014 | 04 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $6,638 | $5,000 | Implemented |