IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0411 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $537 $3,690 n/a
MS0411 # 04 Y:2023 04 2023 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $4,180 $4,512 n/a
MS0411 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $56,198 $786,625 n/a
MS0411 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $113 $335 n/a
MS0411 # 01 Y:2023 01 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,956 $42,807 n/a
UA0146 # 01 Y:2015 01 2015 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $47,379 $42,596 Not Implemented
UA0146 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,518 $1,802 Not Implemented
UA0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,612 $800 Implemented
UA0146 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,141 $27,750 Implemented
UA0146 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,985 $2,995 Not Implemented
UA0146 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,170 $20,711 Not Implemented
UA0146 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,583 $80 Implemented
UA0130 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,506 $6,410 Not Implemented
UA0130 # 05 Y:2014 05 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $6,867 $4,120 Not Implemented
UA0130 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $15,715 $35,154 Not Implemented
UA0130 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,774 $200 Implemented
UA0130 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,890 $100 Implemented
UA0130 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,266 $0 Implemented
UA0130 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,986 $2,522 Not Implemented
MS0252 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,835 $4,800 Not Implemented
MS0252 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $125 Implemented
MS0252 # 07 Y:2004 07 2004 INSTALL TIMERS AND/OR THERMOSTATS $207 $355 Not Implemented
MS0252 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $132 $346 Not Implemented
MS0252 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,256 $230 Implemented
MS0252 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $11,496 Implemented