Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
157
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0560 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $317 | $256 | Implemented |
MA0560 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,875 | $1,200 | Implemented |
MA0560 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,752 | $238,150 | Implemented |
MA0560 # 05 Y:2004 | 05 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $230 | $175 | Implemented |
MA0560 # 02 Y:2004 | 02 | 2004 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $32,756 | $23,710 | Implemented |
MA0562 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,584 | $2,465 | Implemented |
MA0562 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $22,961 | $139,400 | Not Implemented |
MA0562 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $361 | $512 | Implemented |
MA0562 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $820 | $1,640 | Not Implemented |
MA0562 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,626 | $250 | Implemented |
MA0562 # 04 Y:2004 | 04 | 2004 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,903 | $0 | Not Implemented |
MA0562 # 03 Y:2004 | 03 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,445 | $650 | Implemented |
BD0266 # 09 Y:2004 | 09 | 2004 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $2,462 | $1,575 | Not Implemented |
BD0266 # 02 Y:2004 | 02 | 2004 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $6,225 | $4,930 | Implemented |
BD0266 # 01 Y:2004 | 01 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $260 | $11,000 | Implemented |
BD0266 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $504 | $220 | Implemented |
BD0266 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $703 | $1,425 | Implemented |
BD0266 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,081 | $2,765 | Implemented |
BD0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,992 | $600 | Implemented |
BD0266 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $323 | Implemented |
BD0266 # 10 Y:2004 | 10 | 2004 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,020 | $96 | Implemented |
BD0266 # 12 Y:2004 | 12 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,404 | $2,500 | Implemented |
BD0266 # 11 Y:2004 | 11 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,200 | $96 | Implemented |
BD0266 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $329 | $510 | Implemented |
LM0081 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,857 | $300 | Implemented |