ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0588 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,994 | $1,242 | Not Implemented |
MA0588 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $812 | $2,599 | Not Implemented |
MA0588 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,132 | $4,668 | Implemented |
MA0588 # 02 Y:2005 | 02 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $2,294 | $500 | Implemented |
MA0588 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $3,404 | $2,197 | Implemented |
WV0326 # 12 Y:2005 | 12 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $295 | $180 | Implemented |
WV0326 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,818 | $1,000 | Implemented |
WV0326 # 10 Y:2005 | 10 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $459 | $54 | Implemented |
WV0326 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $6,011 | $1,797 | Implemented |
WV0326 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,621 | $2,722 | Not Implemented |
WV0326 # 08 Y:2005 | 08 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $652 | $367 | Implemented |
WV0326 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,897 | $14,339 | Implemented |
WV0326 # 11 Y:2005 | 11 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $140 | Not Implemented |
WV0326 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,047 | $3,517 | Not Implemented |
WV0326 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,386 | $1,840 | Implemented |
WV0326 # 07 Y:2005 | 07 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $780 | $1,076 | Implemented |
WV0326 # 09 Y:2005 | 09 | 2005 | USE SYNTHETIC LUBRICANT | $577 | $17 | Implemented |
MA0586 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,190 | $0 | Not Implemented |
MA0586 # 05 Y:2005 | 05 | 2005 | COMBINE UTILITY METERS | $1,736 | $1,950 | Implemented |
MA0586 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $443 | $1,395 | Implemented |
MA0586 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,081 | $140 | Implemented |
MA0586 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,415 | $350 | Not Implemented |
MA0586 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $841 | $1,646 | Implemented |
MA0586 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,200 | $0 | Implemented |
WV0323 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $12,908 | $363 | Not Implemented |