Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0358 # 01 Y:2009 | 01 | 2009 | ISOLATE HOT OR COLD EQUIPMENT | $21,998 | $720 | Implemented |
UM0358 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,988 | $23,603 | Implemented |
UM0358 # 03 Y:2009 | 03 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,994 | $10,960 | Not Implemented |
UM0358 # 04 Y:2009 | 04 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,766 | $1,200 | Not Implemented |
UM0358 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $69 | $62 | Implemented |
UM0358 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,552 | $36,000 | Implemented |
UM0358 # 07 Y:2009 | 07 | 2009 | INSULATE BARE EQUIPMENT | $5,125 | $11,770 | Implemented |
BD0365 # 14 Y:2009 | 14 | 2009 | PAY BILLS ON TIME TO AVOID LATE FEES | $9,959 | $0 | Not Implemented |
BD0365 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,534 | $5,810 | Not Implemented |
BD0365 # 13 Y:2009 | 13 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $23,508 | $5,200 | Not Implemented |
BD0365 # 12 Y:2009 | 12 | 2009 | INSTALL TURBULATORS | $49,164 | $2,500 | Not Implemented |
BD0365 # 11 Y:2009 | 11 | 2009 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $74,498 | $10,000 | Not Implemented |
BD0365 # 10 Y:2009 | 10 | 2009 | IMPROVE COMBUSTION CONTROL CAPABILITY | $33,921 | $3,500 | Not Implemented |
BD0365 # 09 Y:2009 | 09 | 2009 | INSULATE BARE EQUIPMENT | $1,229 | $392 | Not Implemented |
BD0365 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,476 | $21,600 | Not Implemented |
BD0365 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,480 | $300 | Not Implemented |
BD0365 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,907 | $0 | Not Implemented |
BD0365 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $424 | $500 | Not Implemented |
BD0365 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $284 | $250 | Not Implemented |
BD0365 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $6,817 | $3,450 | Not Implemented |
BD0365 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,135 | $19,446 | Not Implemented |
OK0772 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,160 | $0 | Implemented |
OK0772 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,498 | $2,767 | Not Implemented |
OK0772 # 05 Y:2009 | 05 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,261 | $17,500 | Implemented |
OK0772 # 06 Y:2009 | 06 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $400 | $0 | Not Implemented |