IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0130 # 05 Y:2014 05 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $6,867 $4,120 Not Implemented
UA0130 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,506 $6,410 Not Implemented
UA0130 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,266 $0 Implemented
UA0130 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,890 $100 Implemented
UA0130 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,774 $200 Implemented
UA0130 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,986 $2,522 Not Implemented
UA0130 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $15,715 $35,154 Not Implemented
UD0913 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,485 $5,000 Not Implemented
UD0913 # 06 Y:2014 06 2014 REPLACE BOILER $19,697 $163,500 Not Implemented
UD0913 # 05 Y:2014 05 2014 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $1,623 $7,000 Not Implemented
UD0913 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,643 $8,500 Not Implemented
UD0913 # 03 Y:2014 03 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $511 $1,275 Implemented
UD0913 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $615 $570 Implemented
UD0913 # 01 Y:2014 01 2014 UPGRADE CONVEYORS $528 $255 Not Implemented
UD0913 # 08 Y:2014 08 2014 COVER OPEN TANKS $3,270 $6,780 Implemented
UD0913 # 09 Y:2014 09 2014 INSTALL AUTOMATIC STACK DAMPER $2,665 $0 Implemented
UD0913 # 11 Y:2014 11 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $27,921 $55,000 Not Implemented
UD0913 # 12 Y:2014 12 2014 TREAT AND REUSE RINSE WATERS $15,837 $10,000 Not Implemented
UD0913 # 10 Y:2014 10 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $414,555 $27,000 Not Implemented
MA0735 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,377 $4,200 Implemented
MA0735 # 04 Y:2014 04 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,027 $3,000 Implemented
MA0735 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,084 $500 Implemented
MA0735 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,745 $3,519 Implemented
MA0735 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $23,815 $17,955 Not Implemented
IP0026 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $221 $286 Not Implemented