Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0534 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $50 | Implemented |
WV0534 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $474 | $256 | Implemented |
WV0534 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $1,196 | $1,953 | Implemented |
WV0534 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,016 | $0 | Implemented |
WV0534 # 10 Y:2016 | 10 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $1,125 | Implemented |
WV0534 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,300 | $2,900 | Not Implemented |
WV0534 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,026 | $4,100 | Implemented |
WV0534 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $616 | $315 | Implemented |
WV0534 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,083 | $1,000 | Implemented |
WV0534 # 01 Y:2016 | 01 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $28,092 | $3,000 | Not Implemented |
WV0534 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,565 | $4,150 | Not Implemented |
OR0677 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $2,064 | $658 | Implemented |
OR0677 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,207 | $944 | Not Implemented |
OR0677 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,583 | $22,256 | Not Implemented |
OR0677 # 03 Y:2016 | 03 | 2016 | REPLACE BOILER | $4,164 | $17,322 | Not Implemented |
OR0677 # 02 Y:2016 | 02 | 2016 | USE OPTIMUM TEMPERATURE | $1,822 | $300 | Not Implemented |
OR0677 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $7,372 | $5,408 | Implemented |
BD0489 # 04 Y:2016 | 04 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,075 | $1,320 | n/a |
BD0489 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,215 | $16,983 | n/a |
BD0489 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,863 | $7,497 | n/a |
BD0489 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,418 | $825 | n/a |
BD0489 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $578 | $400 | n/a |
BD0489 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $744 | $411 | n/a |
BD0489 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $196 | $400 | n/a |
BD0489 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $270 | $800 | n/a |