IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,522

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0148 # 07 Y:2008 07 2008 BURN WASTE OIL FOR HEAT $4,155 $0 Implemented
IC0148 # 08 Y:2008 08 2008 TREAT AND REUSE RINSE WATERS $21,012 $27,696 Not Implemented
MI0164 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $114,642 $3,960 Implemented
MI0164 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $80,047 $6,886 Implemented
MI0164 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,553 $22,366 Not Implemented
MI0164 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,799 $40 Implemented
MI0164 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,597 $4,400 Implemented
MI0164 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0164 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,297 $40 Implemented
MI0164 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,657 $4,400 Not Implemented
MI0164 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,992 $1,032 Implemented
MI0164 # 10 Y:2008 10 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,174 $260 Not Implemented
MI0164 # 11 Y:2008 11 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $842 $0 Not Implemented
DL0010 # 01 Y:2007 01 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,964 $2,872 Implemented
DL0010 # 02 Y:2007 02 2007 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,440 $2,500 Not Implemented
DL0010 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,305 $225 Implemented
DL0010 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,529 $450 Implemented
DL0010 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
DL0010 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $622 $622 Not Implemented
DL0010 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $454 $524 Not Implemented
UM0333 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,901 $2,000 Implemented
UM0333 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,803 $50,000 Not Implemented
UM0333 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $8,623 $100 Implemented
UM0333 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,589 $3,480 Implemented
UM0333 # 05 Y:2007 05 2007 REDESIGN PROCESS $2,329 $3,480 Not Implemented