Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0548 # 08 Y:2004 | 08 | 2004 | REDUCE VENTILATION AIR | $607 | $1,831 | Not Implemented |
MA0548 # 09 Y:2004 | 09 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $414 | $200 | Not Implemented |
HO0212 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,162 | $9,938 | Not Implemented |
HO0212 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,715 | $400 | Implemented |
HO0212 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,284 | $7,500 | Not Implemented |
HO0212 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $2,104 | $6,840 | Not Implemented |
HO0212 # 05 Y:1999 | 05 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,419 | $1,467 | Not Implemented |
HO0212 # 06 Y:1999 | 06 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,548 | $2,882 | Implemented |
HO0212 # 07 Y:1999 | 07 | 1999 | CHANGE OPERATING CONDITIONS | $8,954 | $20,000 | Not Implemented |
HO0212 # 08 Y:1999 | 08 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,437 | $2,882 | Implemented |
HO0212 # 09 Y:1999 | 09 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $4,590 | $12,000 | Not Implemented |
HO0212 # 10 Y:1999 | 10 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,379 | $500 | Implemented |
MA0339 # 01 Y:1995 | 01 | 1995 | BURN A LESS EXPENSIVE GRADE OF FUEL | $4,128 | $1,860 | Implemented |
MA0339 # 02 Y:1995 | 02 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,027 | $3,770 | Implemented |
MA0339 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $0 | Implemented |
MA0339 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $504 | $1,010 | Not Implemented |
MA0339 # 05 Y:1995 | 05 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $57,939 | $118,450 | Not Implemented |
MA0339 # 06 Y:1995 | 06 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $23,990 | $500 | Not Implemented |
MA0339 # 07 Y:1995 | 07 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $824 | $3,000 | Not Implemented |
MA0260 # 01 Y:1992 | 01 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,389 | $0 | Implemented |
MA0260 # 02 Y:1992 | 02 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $10,704 | $1,000 | Implemented |
MA0260 # 03 Y:1992 | 03 | 1992 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,095 | $15,537 | Not Implemented |
MA0260 # 04 Y:1992 | 04 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $3,392 | $0 | Implemented |
MA0260 # 05 Y:1992 | 05 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,071 | $1,368 | Implemented |
MA0260 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $1 | Implemented |