Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
174
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0308 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,769 | $500 | Implemented |
UM0301 # 11 Y:2006 | 11 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $218 | $500 | Not Implemented |
UM0301 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,062 | $300 | Not Implemented |
UM0301 # 09 Y:2006 | 09 | 2006 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $328 | $328 | Not Implemented |
UM0301 # 08 Y:2006 | 08 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,415 | $1,363 | Not Implemented |
UM0301 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,325 | $0 | Implemented |
UM0301 # 06 Y:2006 | 06 | 2006 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,498 | $738 | Not Implemented |
UM0301 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,457 | $375 | Implemented |
UM0301 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,344 | $500 | Not Implemented |
UM0301 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,429 | $9,875 | Not Implemented |
UM0301 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $6,754 | $1,971 | Implemented |
UM0301 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $9,958 | $30,000 | Not Implemented |
WV0315 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,438 | $640 | Implemented |
WV0315 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,495 | $2,560 | Implemented |
WV0315 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $467 | $20 | Implemented |
WV0315 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $521 | $609 | Not Implemented |
WV0315 # 12 Y:2005 | 12 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $550 | $97 | Not Implemented |
WV0315 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,726 | $1,000 | Implemented |
WV0315 # 06 Y:2005 | 06 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,739 | $1,060 | Not Implemented |
WV0315 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,969 | $1,275 | Not Implemented |
WV0315 # 04 Y:2005 | 04 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,658 | $0 | Implemented |
WV0315 # 03 Y:2005 | 03 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,606 | $3,300 | Not Implemented |
WV0315 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,395 | $0 | Not Implemented |
WV0315 # 10 Y:2005 | 10 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,126 | $20 | Implemented |
WV0315 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $985 | $140 | Implemented |