IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,516

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0473 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,291 $23,462 n/a
UM0473 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $2,449 $630 n/a
UM0473 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,901 $10,265 n/a
IP0068 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $759 $4 Implemented
IP0068 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $688 $5 Implemented
IP0068 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $720 $38 Not Implemented
IP0068 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $491 $159 Implemented
IP0068 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $500 $285 Implemented
IP0068 # 06 Y:2016 06 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $136 $82 Not Implemented
IP0068 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $5,648 Implemented
IP0068 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $3,317 $10,850 Not Implemented
IP0068 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $196 $940 Not Implemented
UM0468 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $695 $1,500 Not Implemented
UM0468 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $2,150 Not Implemented
UM0468 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,125 $43,167 Implemented
UM0468 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $3,084 $2,000 Implemented
UM0468 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,588 $1,500 Implemented
UM0468 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,119 $10,000 Not Implemented
WV0515 # 01 Y:2015 01 2015 INSULATE FEEDWATER TANK $13,405 $6,253 Not Implemented
WV0515 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,569 $1,700 Implemented
WV0515 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $4,682 $1,278 Implemented
WV0515 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,181 $11,220 Not Implemented
WV0515 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,835 $920 Implemented
WV0515 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,694 $6,400 Not Implemented
WV0515 # 07 Y:2015 07 2015 INSTALL SET-BACK TIMERS $1,310 $1,175 Implemented