Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,072
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0266 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $323 | Implemented |
BD0266 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $329 | $510 | Implemented |
BD0266 # 09 Y:2004 | 09 | 2004 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $2,462 | $1,575 | Not Implemented |
BD0266 # 10 Y:2004 | 10 | 2004 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,020 | $96 | Implemented |
BD0266 # 11 Y:2004 | 11 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,200 | $96 | Implemented |
BD0266 # 12 Y:2004 | 12 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,404 | $2,500 | Implemented |
WI0474 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $213,585 | $150 | Implemented |
WI0474 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,878 | $44 | Implemented |
WI0474 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $22,030 | $17,000 | Not Implemented |
WI0474 # 04 Y:2004 | 04 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $21,301 | $39 | Implemented |
WI0474 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,940 | $790 | Not Implemented |
WI0474 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,067 | $785 | Not Implemented |
LE0186 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM THICKNESS INSULATION | $12,188 | $16,273 | Not Implemented |
LE0186 # 02 Y:2004 | 02 | 2004 | USE OPTIMUM THICKNESS INSULATION | $8,974 | $7,000 | Not Implemented |
LE0186 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,293 | $3,800 | Not Implemented |
LE0186 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM THICKNESS INSULATION | $2,885 | $641 | Not Implemented |
LE0186 # 05 Y:2004 | 05 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $1,428 | $600 | Implemented |
LE0186 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $773 | $200 | Implemented |
LE0186 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $405 | $0 | Implemented |
LE0186 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $340 | $0 | Not Implemented |
LE0186 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $221 | $0 | Implemented |
LE0186 # 10 Y:2004 | 10 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,232 | $0 | Implemented |
LE0186 # 11 Y:2004 | 11 | 2004 | INSTALL OCCUPANCY SENSORS | $354 | $0 | Implemented |
MS0252 # 01 Y:2004 | 01 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $11,003 | $10,413 | Not Implemented |
MS0252 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,867 | $11,496 | Implemented |