Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,085
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0225 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $244 | $296 | Not Implemented |
UM0229 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,914 | $100,000 | Not Implemented |
UM0229 # 02 Y:2003 | 02 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,030 | $5,280 | Not Implemented |
UM0229 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,440 | $6,423 | Not Implemented |
UM0229 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,970 | $300 | Not Implemented |
CO0505 # 01 Y:2002 | 01 | 2002 | COVER OPEN TANKS | $18,110 | $30,000 | Not Implemented |
CO0505 # 02 Y:2002 | 02 | 2002 | COVER OPEN TANKS | $11,730 | $15,600 | Not Implemented |
CO0505 # 03 Y:2002 | 03 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,940 | $5,400 | Implemented |
CO0505 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,800 | $600 | Implemented |
CO0505 # 05 Y:2002 | 05 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,400 | $1,680 | Not Implemented |
CO0505 # 06 Y:2002 | 06 | 2002 | USE OPTIMUM THICKNESS INSULATION | $1,260 | $2,500 | Not Implemented |
CO0505 # 07 Y:2002 | 07 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $770 | $60 | Implemented |
LE0110 # 01 Y:2001 | 01 | 2001 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,815 | $300 | Implemented |
LE0110 # 02 Y:2001 | 02 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,255 | $850 | Not Implemented |
LE0110 # 03 Y:2001 | 03 | 2001 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,628 | $500 | Implemented |
LE0110 # 04 Y:2001 | 04 | 2001 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,500 | $0 | Implemented |
LE0110 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $985 | $1,350 | Not Implemented |
LE0110 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $549 | $0 | Not Implemented |
SU0106 # 01 Y:2001 | 01 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,051 | $0 | Implemented |
SU0106 # 02 Y:2001 | 02 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $399,407 | $1,400,000 | Not Implemented |
SU0106 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,947 | $2,241 | Not Implemented |
SU0106 # 04 Y:2001 | 04 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,158 | $500 | Implemented |
SU0106 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PLANT POWER FACTOR | $3,243 | $10,210 | Implemented |
IC0007 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,050 | $2,125 | Implemented |
IC0007 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,195 | $25,250 | Not Implemented |