IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,112

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0459 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $6,420 $15,880 Implemented
CO0459 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,670 $1,130 Not Implemented
CO0459 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $2,070 Implemented
CO0459 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $440 $560 Not Implemented
CO0459 # 07 Y:2000 07 2000 INSULATE BARE EQUIPMENT $350 $80 Not Implemented
CO0459 # 08 Y:2000 08 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,070 $9,130 Not Implemented
CO0459 # 09 Y:2000 09 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,980 $0 Not Implemented
CO0459 # 10 Y:2000 10 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $600 $0 Implemented
DS0154 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $1,239 $864 Implemented
DS0154 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,609 $10,510 Not Implemented
DS0154 # 03 Y:2000 03 2000 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,737 $8,160 Not Implemented
DS0154 # 04 Y:2000 04 2000 RECYCLE CLEANING SOLVENT AND REUSE $18,740 $17,676 Implemented
DS0154 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,521 $1,336 Implemented
DS0154 # 06 Y:2000 06 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,884 $0 Implemented
SD0230 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $4,048 Implemented
SD0230 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,483 $6,030 Not Implemented
SD0230 # 03 Y:1999 03 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $257,414 $480,000 Not Implemented
SD0230 # 04 Y:1999 04 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,099,432 $1,975,633 Not Implemented
SD0230 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $83,680 $0 Implemented
SD0230 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $39,860 $16,000 Not Implemented
SD0230 # 07 Y:1999 07 1999 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $27,200 $0 Implemented
SD0230 # 08 Y:1999 08 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $0 $2,410 Implemented
MA0441 # 01 Y:1999 01 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,168 $5,704 Implemented
MA0441 # 02 Y:1999 02 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $43,200 $3,000 Implemented
MA0441 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,964 $40,000 Not Implemented