IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,031

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0369 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $6,413 $300 Implemented
UD0369 # 06 Y:1992 06 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,581 $25,000 Not Implemented
UD0369 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,842 $1,800 Implemented
RU0114 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $0 Implemented
RU0114 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $214 Implemented
RU0114 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,104 $2,150 Implemented
RU0114 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $858 $700 Implemented
RU0114 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $2,850 $800 Implemented
RU0114 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,509 $500 Implemented
RU0114 # 07 Y:1991 07 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $52,380 $15,000 Implemented
RU0114 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,442 $9,609 Implemented
CO0206 # 01 Y:1991 01 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $900 $2,500 Not Implemented
CO0206 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $157 Not Implemented
CO0206 # 03 Y:1991 03 1991 REDUCE VENTILATION AIR $891 $2,000 Not Implemented
CO0206 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $600 $1,000 Not Implemented
CO0206 # 05 Y:1991 05 1991 COVER OPEN TANKS $823 $580 Not Implemented
CO0206 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $200 Not Implemented
CO0206 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $242 Not Implemented
CO0206 # 08 Y:1991 08 1991 INSULATE BARE EQUIPMENT $226 $570 Not Implemented
AM0109 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $400 Implemented
AM0109 # 02 Y:1991 02 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $700 $156 Implemented
AM0109 # 03 Y:1991 03 1991 MODERATE COOLING TOWER OUTLET TEMPERATURE $550 $0 Implemented
AM0109 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $294 Implemented
AM0109 # 05 Y:1991 05 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $304 $0 Implemented
AM0109 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32 $17 Implemented