IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0213 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $0 Implemented
SF0213 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $19,198 $3,152 Not Implemented
SF0213 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,282 $950 Not Implemented
SF0213 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $106 $120 Implemented
SF0213 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,113 Implemented
SF0213 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $13,159 $55,000 Not Implemented
SF0213 # 07 Y:2001 07 2001 RECOVER AND REUSE WASTE MATERIAL $105,153 $107,153 Not Implemented
NV0161 # 01 Y:2000 01 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $12,740 $0 Not Implemented
NV0161 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $307 $468 Implemented
NV0161 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $1,699 $574 Implemented
NV0161 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $654 $249 Implemented
NV0161 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $667 $0 Implemented
NV0161 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,212 $9,788 Not Implemented
SD0245 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,319 $14,000 Not Implemented
SD0245 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $7,454 $5,833 Not Implemented
SD0245 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,787 $2,500 Implemented
SD0245 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,523 $4,000 Not Implemented
SD0245 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,081 $3,000 Not Implemented
SD0245 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $905 $900 Not Implemented
SD0245 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $0 Implemented
SD0245 # 08 Y:2000 08 2000 $6,118 $7,000 Not Implemented
SD0230 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $4,048 Implemented
SD0230 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,483 $6,030 Not Implemented
SD0230 # 03 Y:1999 03 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $257,414 $480,000 Not Implemented
SD0230 # 04 Y:1999 04 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,099,432 $1,975,633 Not Implemented