Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0697 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $240 $91 Implemented
UD0697 # 14 Y:2004 14 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $49 $0 Not Implemented
UD0557 # 01 Y:1998 01 1998 $42,942 $12,000 Implemented
UD0557 # 03 Y:1998 03 1998 RECYCLE CLEANING SOLVENT AND REUSE $9,078 $0 Not Implemented
UD0557 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,643 $1,440 Not Implemented
UD0557 # 05 Y:1998 05 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,636 $6,680 Not Implemented
UD0557 # 06 Y:1998 06 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,778 $0 Not Implemented
UD0557 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,203 $0 Implemented
UD0369 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,504 $0 Implemented
UD0369 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $612 $1,600 Not Implemented
UD0369 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,020 $0 Implemented
UD0369 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $850 $0 Implemented
UD0369 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $6,413 $300 Implemented
UD0369 # 06 Y:1992 06 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,581 $25,000 Not Implemented
UD0369 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,842 $1,800 Implemented
UD0165 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $33,571 $100,000 Not Implemented
UD0165 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,848 $1,500 Implemented
UD0165 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,435 $0 Implemented
UD0165 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,934 $4,600 Implemented
UD0165 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,135 $2,000 Implemented
UD0165 # 03 Y:1985 03 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,623 $250 Not Implemented
UD0165 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,520 $21,000 Not Implemented