Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2312 # 13 Y:2023 | 13 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,197 | $515,729 | n/a |
UC2312 # 11 Y:2023 | 11 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $892 | $2,151 | n/a |
UC2312 # 12 Y:2023 | 12 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,895 | $34,958 | n/a |
UC2312 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $445 | $390 | n/a |
UC2312 # 10 Y:2023 | 10 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $54,436 | $125,322 | n/a |
UC2312 # 07 Y:2023 | 07 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,620 | $19,500 | n/a |
UC2312 # 08 Y:2023 | 08 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,522 | $500 | n/a |
UC2312 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,947 | $9,514 | n/a |
UC2312 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,573 | $75 | n/a |
UC2312 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,161 | $428 | n/a |
UC2312 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,502 | $150 | n/a |
UC2312 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,426 | $1,300 | n/a |
UC2312 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,710 | $1,062 | n/a |
MA0560 # 05 Y:2004 | 05 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $230 | $175 | Implemented |
MA0560 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,752 | $238,150 | Implemented |
MA0560 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,875 | $1,200 | Implemented |
MA0560 # 02 Y:2004 | 02 | 2004 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $32,756 | $23,710 | Implemented |
MA0560 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $317 | $256 | Implemented |
HO0200 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,818 | $7,776 | Implemented |
HO0200 # 08 Y:1999 | 08 | 1999 | $10,000 | $35,000 | Not Implemented | |
HO0200 # 07 Y:1999 | 07 | 1999 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $25,402 | $22,000 | Not Implemented |
HO0200 # 06 Y:1999 | 06 | 1999 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $14,628 | $8,000 | Not Implemented |
HO0200 # 05 Y:1999 | 05 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,395 | $4,800 | Implemented |
HO0200 # 04 Y:1999 | 04 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $451 | $100 | Not Implemented |
HO0200 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $944 | $1,500 | Not Implemented |