Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
202
matching recommendationsSIC | 348 | Ordnance And Accessories, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0324 # 06 Y:2009 | 06 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $258 | $120 | Not Implemented |
LL0324 # 05 Y:2009 | 05 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,089 | $1,246 | Not Implemented |
LL0324 # 08 Y:2009 | 08 | 2009 | INSTALL OCCUPANCY SENSORS | $142 | $270 | Not Implemented |
LL0324 # 01 Y:2009 | 01 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $51,066 | $5,850 | Implemented |
LL0324 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $158 | $1,435 | Not Implemented |
LL0324 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,689 | $1,050 | Not Implemented |
LL0324 # 02 Y:2009 | 02 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,552 | $1,140 | Not Implemented |
LL0324 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,908 | $265 | Not Implemented |
UA0036 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $912 | $1,500 | Implemented |
UA0036 # 03 Y:2009 | 03 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,005 | $15,600 | Not Implemented |
UA0036 # 02 Y:2009 | 02 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $3,429 | $1,700 | Implemented |
UA0036 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,392 | $0 | Implemented |
UA0036 # 07 Y:2009 | 07 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,637 | $17,500 | Not Implemented |
UA0036 # 05 Y:2009 | 05 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,452 | $10,320 | Not Implemented |
UA0036 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,387 | $40,768 | Implemented |
UA0036 # 08 Y:2009 | 08 | 2009 | USE PHOTOCELL CONTROLS | $453 | $1,337 | Not Implemented |
MA0634 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $498 | $500 | Implemented |
MA0634 # 05 Y:2008 | 05 | 2008 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,034 | $6,000 | Not Implemented |
MA0634 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,407 | $20,000 | Not Implemented |
MA0634 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,014 | $119,495 | Implemented |
MA0634 # 04 Y:2008 | 04 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,932 | $2,500 | Implemented |
MA0634 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,058 | $3,000 | Not Implemented |
OR0523 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,220 | $1,160 | Implemented |
OR0523 # 05 Y:2007 | 05 | 2007 | COVER OPEN TANKS | $3,000 | $9,000 | Not Implemented |
OR0523 # 02 Y:2007 | 02 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $77,000 | $5,000 | Not Implemented |