IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 3489 Ordnance And Accessories, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0015 # 08 Y:2023 08 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,262 $1,310 n/a
CI0015 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,292 $5,000 n/a
CI0015 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $2,700 n/a
CI0015 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,958 $3,500 n/a
CI0015 # 04 Y:2023 04 2023 REPLACE BOILER $3,770 $9,000 n/a
CI0015 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,757 $0 n/a
CI0015 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,511 $165,000 n/a
CI0015 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $88,567 $1,500 n/a
UA0186 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,247 $52,665 Not Implemented
UA0186 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,615 $4,645 Implemented
UA0186 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,673 $500 Not Implemented
UA0186 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,872 $740 Implemented
UA0186 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $60 Implemented
AS0436 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,490 $12,200 Not Implemented
AS0436 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106,561 $115,692 Not Implemented
AS0436 # 03 Y:2017 03 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $887 $1,113 Not Implemented
AS0436 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $8,511 $4,200 Not Implemented
AS0436 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $100 Not Implemented
UD0930 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,352 $0 Implemented
UD0930 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $59,188 $0 Implemented
UD0930 # 05 Y:2015 05 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $43,664 $10,000 Not Implemented
UD0930 # 04 Y:2015 04 2015 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $34,411 $5,100 Implemented
UD0930 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,067 $17,500 Not Implemented
UD0930 # 07 Y:2015 07 2015 INSTALL COMMON HEADER ON COMPRESSORS $5,330 $1,018 Implemented
UD0930 # 03 Y:2015 03 2015 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $2,426 $300 Not Implemented