IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,298

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0823 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,268 $25 Implemented
UD0823 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $524 $25 Implemented
UD0823 # 13 Y:2010 13 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,010 $50,050 Implemented
UD0823 # 15 Y:2010 15 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $355 $25 Implemented
WV0406 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,098 $49,200 Implemented
AM0577 # 01 Y:2010 01 2010 INSULATE BARE EQUIPMENT $33,500 $1,800 Implemented
AM0577 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,500 $9,155 Implemented
AM0577 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $6,410 $21,100 Implemented
AM0577 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,980 $17 Implemented
AM0577 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $300 Implemented
AM0577 # 11 Y:2010 11 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $310 $190 Implemented
AM0577 # 12 Y:2010 12 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $270 $0 Implemented
LL0328 # 01 Y:2010 01 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $26,498 $304 Implemented
LL0328 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,654 $3,600 Implemented
LL0328 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,572 $2,800 Implemented
LL0327 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,425 $4,180 Implemented
LL0327 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $30 Implemented
UM0363 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,083 $500 Implemented
UM0363 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,498 $10,000 Implemented
UM0363 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,241 $1,000 Implemented
UM0363 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $2,173 $1,375 Implemented
UM0363 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $542 $1,568 Implemented
AM0566 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,230 $111,190 Implemented
AM0566 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $35,170 $1,300 Implemented
AM0566 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,100 $3,000 Implemented