IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0249 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $6,174 $27,270 Implemented
UM0249 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,436 $975 Implemented
LL0182 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,248 $33,150 Implemented
LL0182 # 04 Y:2004 04 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,377 $500 Implemented
LL0182 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,354 $60,000 Implemented
LL0182 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,593 $12,360 Implemented
LL0182 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $18,697 $3,264 Implemented
LL0182 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,036 $74,480 Implemented
LL0182 # 09 Y:2004 09 2004 USE POWER DURING OFF-PEAK PERIODS $7,577 $8,004 Implemented
LL0182 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,481 $1,542 Implemented
LL0182 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $1,680 Implemented
LL0182 # 12 Y:2004 12 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $9,300 Implemented
UD0688 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $143,925 $500,000 Implemented
UD0688 # 03 Y:2004 03 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $31,450 $7,250 Implemented
UD0688 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $12,457 $31,250 Implemented
UD0688 # 08 Y:2004 08 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,000 $1,040 Implemented
UD0688 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,165 $6,370 Implemented
UD0688 # 11 Y:2004 11 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,745 $470 Implemented
UD0688 # 13 Y:2004 13 2004 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,840 $0 Implemented
UD0688 # 14 Y:2004 14 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,460 $0 Implemented
UD0688 # 18 Y:2004 18 2004 INSULATE BARE EQUIPMENT $880 $1,820 Implemented
LL0179 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,033 $2,120 Implemented
LL0179 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $15 Implemented
LL0179 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $245 Implemented
LL0179 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $230 Implemented