IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0143 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,884 $4,500 Implemented
AM0789 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,740 $46,480 Implemented
AM0789 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $15,300 $53,500 Implemented
AM0789 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,100 $2,000 Implemented
AM0789 # 05 Y:2019 05 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,600 $0 Implemented
AM0789 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,900 $1,620 Implemented
LS1914 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,599 $164 Implemented
LS1914 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $588 $0 Implemented
LS1914 # 03 Y:2019 03 2019 USE PHOTOCELL CONTROLS $294 $226 Implemented
LS1914 # 04 Y:2019 04 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $164 $90 Implemented
NL0036 # 01 Y:2019 01 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,990 $37,155 Implemented
NL0036 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,862 $7,623 Implemented
NL0036 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $2,905 Implemented
NL0036 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $500 Implemented
WV0581 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,868 $78,000 Implemented
WV0581 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,233 $58,107 Implemented
WV0581 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $9,387 $4,000 Implemented
WV0581 # 06 Y:2019 06 2019 RECYCLE WHITE WATER $8,651 $4,100 Implemented
WV0581 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $4,849 $738 Implemented
WV0581 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $100 Implemented
WV0581 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $938 $0 Implemented
WM0133 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $949 $500 Implemented
AM0777 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,772 $2,000 Implemented
AM0777 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,417 $9 Implemented
AM0777 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $1,855 Implemented