IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0011 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $56 Implemented
ST0011 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $435 Implemented
ST0011 # 09 Y:1984 09 1984 RECOVER WASTE HEAT FROM EQUIPMENT $668 $500 Implemented
LT0008 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $380 $300 Implemented
LT0008 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $375 Implemented
KU0135 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $9,768 $0 Implemented
KU0135 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $194 $0 Implemented
KU0135 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,716 $2,000 Implemented
KU0135 # 09 Y:1984 09 1984 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $4,203 $100 Implemented
KU0135 # 10 Y:1984 10 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,389 $5,000 Implemented
KU0135 # 13 Y:1984 13 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,886 $78 Implemented
KU0135 # 14 Y:1984 14 1984 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,763 $3,100 Implemented
KU0135 # 19 Y:1984 19 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $905 $300 Implemented
KU0135 # 22 Y:1984 22 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $368 $10 Implemented
OK0152 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $196 $530 Implemented
OK0152 # 03 Y:1984 03 1984 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $292 $480 Implemented
OK0152 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292 $134 Implemented
OK0152 # 05 Y:1984 05 1984 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $204 $0 Implemented
OK0152 # 07 Y:1984 07 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $124 Implemented
OK0152 # 08 Y:1984 08 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $58 $58 Implemented
ST0003 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $372 Implemented
ST0003 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,227 $24 Implemented
ST0003 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,017 $537 Implemented
ST0003 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $786 $2,035 Implemented
ST0003 # 05 Y:1984 05 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $156 $0 Implemented