IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0221 # 16 Y:2023 16 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,688 $4,615 Implemented
DL0221 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,723 $0 Implemented
DL0221 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,683 $0 Implemented
DL0221 # 04 Y:2023 04 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $781 $0 Implemented
DL0221 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $293 $0 Implemented
DL0221 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $500 Implemented
DL0221 # 09 Y:2023 09 2023 AIR CONDITION ONLY SPACE NECESSARY $2,678 $610 Implemented
DL0221 # 11 Y:2023 11 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $812 $2,301 Implemented
DL0221 # 12 Y:2023 12 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,218 $1,080 Implemented
DL0221 # 13 Y:2023 13 2023 REPAIR AND ELIMINATE STEAM LEAKS $53,076 $20,000 Implemented
DL0221 # 14 Y:2023 14 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,645 $500 Implemented
WV0581 # 06 Y:2019 06 2019 RECYCLE WHITE WATER $8,651 $4,100 Implemented
WV0581 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,233 $58,107 Implemented
WV0581 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,868 $78,000 Implemented
WV0581 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $9,387 $4,000 Implemented
WV0581 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $4,849 $738 Implemented
WV0581 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $100 Implemented
WV0581 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $938 $0 Implemented
LE0381 # 05 Y:2014 05 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,233 $771 Implemented
LE0381 # 01 Y:2014 01 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,880 $36 Implemented
LE0381 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $6,567 $9,190 Implemented
LE0381 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,665 $3,500 Implemented
LE0346 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,093 $14,250 Implemented
LE0346 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,292 $12,880 Implemented
LE0346 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,166 $3,152 Implemented