Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0064 # 06 Y:1982 | 06 | 1982 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $586 | $0 | Implemented |
OK0064 # 05 Y:1982 | 05 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $485 | $0 | Implemented |
OK0064 # 04 Y:1982 | 04 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $1,749 | $560 | Implemented |
OK0064 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,330 | $1,405 | Implemented |
OK0064 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $1,830 | $400 | Implemented |
OK0064 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $707 | $56 | Implemented |
OK0059 # 06 Y:1982 | 06 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,097 | $984 | Implemented |
UD0051 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,504 | $900 | Implemented |
UD0051 # 03 Y:1982 | 03 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,219 | $6,160 | Implemented |
UD0051 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,295 | $753 | Implemented |
UD0051 # 01 Y:1982 | 01 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $460 | $0 | Implemented |
OK0059 # 04 Y:1982 | 04 | 1982 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $230 | $1,137 | Implemented |
OK0046 # 03 Y:1982 | 03 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,800 | $148 | Implemented |
OK0051 # 07 Y:1982 | 07 | 1982 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,612 | $12,150 | Implemented |
OK0051 # 06 Y:1982 | 06 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29 | $13 | Implemented |
OK0051 # 05 Y:1982 | 05 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $130 | $0 | Implemented |
OK0051 # 02 Y:1982 | 02 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,675 | $3,000 | Implemented |
OK0051 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,367 | $200 | Implemented |
OK0057 # 06 Y:1982 | 06 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $4,092 | $1,100 | Implemented |
OK0057 # 05 Y:1982 | 05 | 1982 | COVER OPEN TANKS | $640 | $655 | Implemented |
OK0057 # 03 Y:1982 | 03 | 1982 | OPTIMIZE PLANT POWER FACTOR | $20,704 | $36,360 | Implemented |
OK0057 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,500 | $500 | Implemented |
UD0025 # 03 Y:1982 | 03 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $162 | $0 | Implemented |